Post Offer Free
Guangdong Yake New Energy Technology Co., Ltd
Guangdong Yake New Energy Technology Co., Ltd  

Gold Index: 830

You are here: home  > industrial heat exchanger  > industrial cabinet air conditioner

industrial cabinet air conditioner 

Price: 100.0~500.0 USD 
Payment Terms: T/T,L/C 
Place of Origin: Guangdong, China (Mainland) 
inquire
Add to My Favorites
HiSupplier Escrow
Share |

Product Detail

Model No.: KJH-15Q
Packing: foam inside, carton outside
Type: Cabinet Air Conditioner
Brand Name: YAKE
Production Capacity: 5000sets
Delivery Date: 25 days after receive depos...
Certification: CE
cooling capacity: 1500W: rated voltage:220V/50Hz

YAKE Cabinet air conditioners
1.fully closed air circle system
2. air to air heat exchanger

Application

 

1. CNC system electric control cabinet, power supply cabinet for electrical process machine tool

 

2. Operation cabinet of heavey machinery

 

3. Telecom, Commuication and progran control exchanger

 

4. All kinds of Measuring Instrument

 

 

Features

 

1. Fully closed air circle system, prevent the dust, gas fog and humid air entering into the control cabine

 

2. Suitiable for electric control cabinets which do not have very strict demand on working temperature

 

3. Working temperature is higher than air dew point ad it has a good environment temperatrure adapability

 

 

Remarks

 

1. The installation place should be capable to stand its weight and transfering force when working

 

2. Prohibit jams at the intake, ensure te distance between the in-outlet and deterence is over one meter, the unit ventilation shouldb be good, otherwise, it will influence the cooling effect and may lead to breakdowm

 

3. The unit should be installed at the place with a good airflow, it is forbiden to have dangerous, flammable and explodable products around them

 

4. The inlet filter must be cleaned once a week, othervise, it will influence the cooling effect and may lead to breakdown

 

5. Dring operating, it should stop working for settlement when something wrong appears, it is not allowed to continue workingwith malfunction.

 

6. Avoid direct sun shining and keee away from heat source

 

7. Be aware of place the water discharge pipe

 

8. After the first one-month operation, you should check carefully every links and tighten parts, it should not be loosed, damaged and so on, only neutral scour can be used t clean the surface of the unti.


bigPhoto
 Ms. Susanna

Tel: 86-757-89967062
Contact to this supplier

Didn't find what you're looking for? Post Buying Lead or contact HiSupplier Customer Service Center  for help!

Related Search

Find more related products in following catalogs on Hisupplier.com

Company Info

Guangdong Yake New Energy Technology Co., Ltd [China (Mainland)]


Business Type:Manufacturer
City: Foshan
Province/State: Guangdong
Country/Region: China (Mainland)

You May Like: